Project Details:

Fyvie WwTW

Farrans Enisca scope of work included design and construction of civil engineering works and all associated Process / Mechanical and Electrical works (including Instrumentation, Controls, Telemetry):

  • Inlet works with 6mm 2D screened storm overflow, flow control penstock and flume
  • 3 no. septic tanks with inlet flow split and exit flow combining chambers
  • Intermediate pumping station with upstream chamber containing Copasac 3mm screens and emergency overflow pipe.
  • 2 no. above-ground SAF units c/w associated blowers, instrumentation
  • 2 no. above-ground final settlement tanks
  • Final effluent sampling and flow recording chamber
  • New MCC, MCC Kiosk, Automation/Systems Integration, Telemetry
  • Associated chambers, draw pits, ducts, etc.
  • Demolition of the existing works
  • Access road, paths and gravelled site area, landscaping bund, security fence, gates, etc.

Project Details

  • Client:
    Scottish Water
  • Scope:
    Design and Construct
  • Capacity Of Plant
    1500PE / 5l/s
Contact Enisca